Loader
yeo group
HV TRANSMISSION LINE DESIGN

HV TRANSMISSION LINE DESIGN

-36kV to500 kV
-Power Transmission Line Study
-Determination of the route
-Survey of land, ground and geographic conditions
 
 
HV SUBSTATION DESING

HV SUBSTATION DESING

-36kV to500 kV
-Gasinsulatedswitchgearforsubsitatıon(GIS)
-Airinssulatedsubsatıon(AIS)
-Hybridgasinsulatedswitchgaer(HGIS)
 
 
PRIMARY EQUIPMENT SELECTION

PRIMARY EQUIPMENT SELECTION

-Circuitbreaker
-Disconnector
-Voltagetransformer
-Currenttransformer
 
SUBSTATION PROTECTION SYSTEM DESING

SUBSTATION PROTECTION SYSTEM DESING

-Protectionandcontrolrelaypanel desing
-FeederProtection
-TransformerProtection
-BBP Protection

AUTOMATION

AUTOMATION

-Gridcommunicationpanel
-Automationpanel (RTU etc. )
-Meteringpanel
-EnergySCADA solution
 
 
STEEL STRUCTURE DESING

STEEL STRUCTURE DESING

-Allkinds of steel construction design
-The StaticCalculation
-ProductionDrawing
-SupplyandInstallation
CIVIL WORK DESING

CIVIL WORK DESING

-Panel Layout
-Construction of SubstationBuilding
-Construction of EquipmentBase
-Contructionof Cable Channel
 
 
yeo group