DSI Turkish Water Authority Korkuteli Irrigation Project
Loader
yeo group

Antalya Korkuteli Irrigation Project / Turkey

Project Description: Korkuteli Irrigation Project;

The irrigation in the region of Korkuteli was set up as an open network with irrigation canals from Korkuteli Dam. With a growing population and an aging irrigation structure the provision of water forall could not be guaranteed. So for the modernization of the pipeline of 250 km length, ABB provides 631 units of RTU511, the new compact and cost-efficient product of the RTU500 series. 

End-User: DSI Turkish Water Authority;

Scope of works:

  • Solar Panels;
  • Solar Batteries;
  • UPS (Uninterrupted Power Supply);
  • ABB RTU 560 (920 pieces);
  • SCADA System;
  • GSM Modems, RF Modems;
  • Software and Hardware Engineering;
  • Electromagnetic Flowmeters;
  • Pressure Transmitters;
Kütahya WWTP / Turkey

-

Wadi Arab WTP Stage II

Atıksu Arıtma Tesisi Elektrik ve Otomasyon

ISKI Ataköy WWTP Stage II / Turkey

Elektrifikasyon ve Otomasyon İşleri

Diyarbakir Ergani WTP / Turkey

Elektrifikasyon ve Otomasyon İşleri

Şırnak Cizre WTP / Turkey

Elektrifikasyon ve Otomasyon İşleri

Anamur Irrigation Project / Turkey

Sulama Projesi & Elektrik Otomasyon İşleri

Tayasir Wastewater Treatment Plant Electric and Automation Project

Demineralizasyon Tesisi E&A İşleri

Kullar WWTP / Turkey

Elektrifikasyon ve Otomasyon İşleri

Wolkaite Irrigation Project / Ethiopia

Turnkey Electrical & Automation Works

ISKI Ömerli WTP / Turkey

Electrical & Automation Works

Edirne Kayalıköy WTP / Turkey

Electrification & Automation Works

Karabuk WTP / Turkey

Karabuk WTP / Turkey

Gazze Pompa İstasyonu ve Buriej AAT

Elektrifikasyon ve Otomasyon İşleri

Antalya Korkuteli Irrigation Project / Turkey

Turnkey Electrification & Automation Works

Erbil Combined Cycle Power Plant / Iraq

Demineralisation Plant E&A Works

yeo group