ISKI Istanbul Water Authority Ömerli Water Treatment Plant
Loader
yeo group

ISKI Ömerli WTP / Turkey

Project Description: ISKI Ömerli WTP Electrical & Automation Works;

The maximum capacity of the conversion daily is 500.000 m3. Physical and chemical treatment including treatment process, ventilation, clarification, sludge treatment, filtration and disinfection;

End-User: Istanbul Water Authority;

Scope of works:

  • Supply and installation of MV Panels and Transformers;
  • Production of all MDP, MCCs, PLCs;
  • All Electrical Site Works and Engineering;
  • Earthing, Lighting, Cabling, Installation of Cable Trays, Outdoor Lighting, CCTV, Fire Protection System;
  • Installation of SCADA and Automation System;
  • Tests: Pre-operational Checkouts, Functional Testing, Start-up Testing, Reliability Testing;
  • Commissioning, Training and Documentation;
Kütahya WWTP / Turkey

-

Wadi Arab WTP Stage II

Atıksu Arıtma Tesisi Elektrik ve Otomasyon

ISKI Ataköy WWTP Stage II / Turkey

Elektrifikasyon ve Otomasyon İşleri

Diyarbakir Ergani WTP / Turkey

Elektrifikasyon ve Otomasyon İşleri

Şırnak Cizre WTP / Turkey

Elektrifikasyon ve Otomasyon İşleri

Anamur Irrigation Project / Turkey

Sulama Projesi & Elektrik Otomasyon İşleri

Tayasir Wastewater Treatment Plant Electric and Automation Project

Demineralizasyon Tesisi E&A İşleri

Kullar WWTP / Turkey

Elektrifikasyon ve Otomasyon İşleri

Wolkaite Irrigation Project / Ethiopia

Turnkey Electrical & Automation Works

ISKI Ömerli WTP / Turkey

Electrical & Automation Works

Edirne Kayalıköy WTP / Turkey

Electrification & Automation Works

Karabuk WTP / Turkey

Karabuk WTP / Turkey

Gazze Pompa İstasyonu ve Buriej AAT

Elektrifikasyon ve Otomasyon İşleri

Antalya Korkuteli Irrigation Project / Turkey

Turnkey Electrification & Automation Works

Erbil Combined Cycle Power Plant / Iraq

Demineralisation Plant E&A Works

yeo group