YEO Teknoloji Enerji ve Endüstri Anonim Şirketi was founded.
A partnership contract was signed with SIEMENS, an international technology company with the features of excellence, innovation, quality and solidity.
The automation and computing project, including observing, checking and integrating production line to the Enterprise Resource Planning System (ERP) and advanced reporting, began with one of the greatest cable manufacturing companies in the world, NEXANS in their facilities located in Tuzla, İstanbul.
Production Line Electrification & Automation and Integration of Welding Robot Project in Hayers Lemmerz İnci Jant Factory, located in Manisa, was completed successfully, contributing to the efficiency of the factory.
For trends that will be called advanced reporting in the future, a reactor automation project in Sandoz Pharmaceutical Factory was carried out, entering all of the production data on a non erasable database and using softwares confirmed by FDA.
Electrical & Automation works started on wastewater treatment plants in Ankara, Konya and Muş branches of Türkiye Şeker Factories as a turnkey solution.
A partnership contract was signed with a global technology company based in Switzerland, ABB, which leads the transformation of the people and the industry for a sustainable future..
To supply water from the sea, automation project on the power plant of Eren Energy, which generates 1.369 MW power, located in Zonguldak was carried out. After six months of preparation, during downtime lasted four days, the installation, testing and implementation processes were completed successfully.
In the Fire Detection and Suppression System Project in Adana Cehyan Terminal, which is the first project of BOTAŞ, the automation of highly secured entrance cards with spares that can be changed without cutting the power was carried out.
The Energy SCADA System Project (Supervisory Control and Data Acquisition) of the DHMİ Adana Airport began.
Started working on business development in Azerbaijan, where we will be at the service of many great companies such as SOCAR, Azerenerji, Azerışık.
In order to meet the increasing demand in turnkey solutions, YEO Technology reorganized its corporate infrastructure by grouping activities into seven departments, Engineering Solutions, Electrification Solutions, Automation Solutions and Industrial Programming - Controlling Systems, Digitalization - IoT and Communication Solutions, Power Systems Solutions, Solar Power Plants, Manufacturing of Electrical, Controlling and Automation Panels, concordantly strengthen its systematical working structure.
As a part of the Wolkaite Irrigation Project in Ethiopia, electrical & automation works on pumping stations began.
Turnkey of electricity & automation works of a cement plant with a capacity of 5,000 tons/day began.
With Wadi Arab Water System Phase II Project in Jordan, 1.700.000 people were provided with water.
Operations in Solar Energy area started with Solar Power Plant Projects, generating 3MWp in Konya, 4,4MWp in Kahramanmaraş and 2,2MW in Isparta.
The electrical and automation works on one of the greatest wastewater investments of İSKİ, Ataköy Advanced Wastewater Treatment Plant Phase II, with a capacity of 240.000 m3/day started.
YEO Technology’s expertise on Solar Power Systems became officially registered with the brand of YEO Solar Energy.
A biogas power plant project was carried out, preventing 277.000 tons of CO2 gas from emission in the Istanbul Metropolitan Municipality.
Electrical & Automation works on The Wastewater Treatment Plant Project in Kütahya started with the financial support from welfare fund of General Directorate of European Union (IPA).
The National Load Dispatch Center Project, which will later on ensure energy security of Azerbaijan, including today’s trends such as digitalization, data analytics and advanced reporting (21 Power Plants & 72 Substations & 249 Power Plant Monitoring and Controlling System for Distribution Centers) started.
With Regular 220kV GIS Substation Project, first gas insulated substation in Azerbaijan was installed.
Nomad 220kV Substation Project in Kazakhstan was carried out.
A partnership contract was signed with USA-based Rockwell Automation, which is a leading company in automation and information.
A partnership agreement was signed with the Chinese company Huawei, a worldwide leader in communication and information technologies.
With the completed construction of biogas, biomass, geothermal and solar energy systems in 11 different cities of Turkey, 71 MW of power was obtained and 5.890.706 ton/year of carbon emission was prevented.
The Solar Power Plant Projects with 11 MW in Malyn and 16 MW in Ihnatpil, which are located in Jitomir, Ukraine, were completed successfully.
A partnership contract was signed with Schneider Electric, a French-based company that provides digital energy and automation solutions for efficiency and sustainability.
A partnership contract was signed with PTC, a USA-based company that provides augmented reality, Industrial IoT and digital solutions.
As a part of BOTAŞ TurkStream Onshore-2 Phase-1 Gas Pipeline Project, SCADA and automation operations were completed.
Automation of distribution lines within the DSİ Turkey - Cyprus Water Supply Project was completed successfully.
Electrical automation works on an irrigation project in Ruanda began.
As a part of Orange Metro Line Project in capital Lahore, construction of the first metro line in Pakistani, the integration of substation to Pakistani National Load Dispatch Center was completed.
In Palestine, Jenin Industrial Free Zone, the construction of High Voltage Substation started, with the financial support of TOBB.
Being its first project in United Arab Emirates, Dubai Electricity and Water Authority Palm Jumeirah Island Desalination Plant Automation was bought by tender and completed successfully.
Financed by U.S. Agency for International Development (USAID), the HV Power Center Substation Project in Northeast & Southeast Afghanistan.
Works on SCADA Integration with medium voltage distribution centers in VEDAŞ Vangölü Electricity Distribution Inc, including 143 cities such as Van, Muş and Bitlis began.
Biogas Power Plant Projects in seven different cities in Turkey with a total 19,5 MW of power began.
Turnkey of ground-mounted solar power plant with 2,2 MW of power began in TÜPRAŞ Batman Refinery.
The construction of substations in TEİAŞ with a capacity of 154 kV power began, generating 100MVA power in Mudanya and 80MVA power in Yıldırım.
400kV Gas Insulated Substation (GIS) Project began as a part of 2x600 Hunutlu Power Plant located in Adana.
By combining expertise of YEO Technology in solar and wind power plants department and vast knowledege of Aras Deniz İnşaat in onshore - offshore construction, Marinergy Company was established.
As a part of ETİ Maden Emet Sulphuric Acid Production Plant Project, with a capacity of 350.000 on/year, engineering and project management operations were carried out.
Engineering and project management operations on ETİ Maden Bandırma Facilities Installation of Turbogenerator Systems and Power Infrastructure Modernization Project started.
As a project with Republic of Turkey Ministry of National Education, construction of Solar Power Plants in 48 school buildings and outbuildings located in Adıyaman, Diyarbakır, Gaziantep, Kilis, Osmaniye, Konya, Mersin, Şanlıurfa and Kahramanmaraş started.