30.000 m3 / day will be constructed with an advanced biological wastewater treatment plant with a capacity of 240.000 m3 / day

İşlerin Kapsamı

- Supply and Installation of MV Panels and Transformers
- Production of all MDP, MCCs, PLCs
- All Electrical Site Works and Engineering
- Earthing, Lighting, Cabling, Installation of Cable Trays, Outdoor Lighting, CCTV, Fire Protection System;
- Installation of SCADA and automation system; Siemens S7-1500 PLCs, Siemens WinCC Redundant SCADA system
- Supply and Installation of Videowall, Supply of Industrial PDA, 6000 hardwired I/Os. 2000 soft I/Os
- Tests: Pre-operational Checkouts, Functional Testing, Start-up Testing, Reliability Testing
- Commissioning, Training and Documentation