EN TR RU
YEO Group

Wadi Arab Su Temin Sistemi 2. Kademe

Ürdün


25.000 m³/day located 140 km to the north of Amman

İşlerin Kapsamı

- Supply and Installation of MV Panels, MV Softstarters and Transformers
- 64 pcs. ABB ZS1 12kV 50kA MV Switchgears
- 18 pcs. Allen Bradley SMCFlex MV Softstarters
- Sonmez STS Transformers
- Production of all MDP, MCCs, PLCs
- All Electrical Site Works and Engineering
- Earthing, Lighting, Cabling, Installation of Cable Trays, Outdoor Lighting, CCTV, Fire Protection Systems
- Installation of SCADA and Automation System
- 30 pcs Rockwell ControlLogix and CompactLogix PLCs
- Rockwell Factory Talk Redundant SCADA System, Rockwell Historian Server, Win911 Alarm Notification System
- 4000 hardwired I/Os 2000 soft I/Os
- Tests: Pre-operational Checkouts, Functional Testing, Start-up Testing, Reliability Testing
- Commissioning, Training and Documentation

Projeler