The Plant was designed for 97,705 m3/day average waste water flow rate for 2030 and 120,868 m3/day for 2045

Scope of Works

- Supply and installation of MV Panels and transformers
- Production of all MDP, MCCs, PLCs
- All electrical site works and engineering; Earthing, Lighting, Cabling, Installation of cable tray, Outdoor lighting, CCTV, Fire Protection System
- Installation of SCADA and automation system; 4 pcs ABB AC500 PLCs, ABB 800xA SCADA Systems, 2000 hardwired I/Os
- Test: Cold and Hot Testing, Functional Testing, Start-up Testing
- Commissioning, Training and Documentation