EN TR RU
YEO Group

The General Directorate of State Hydraulic Works Korkuteli Irrigation

Turkey


Pipeline of 250 km length

Scope of Works

- Solar Panels
- Solar Batteries
- UPS (Uninterrupted Power Supply)
- ABB RTU 560 (920 pieces)
- SCADA System
- GSM Modems, RF Modems
- Software and Hardware Engineering
- Electromagnetic Flowmeters
- Pressure Transmitters

Projects