EN TR RU
YEO Group

Cihanbeyli 3 MW Solar Power Plant

Turkey

3.3 MVA, 9.850 Solar Panels, 3 Central Inverters

Scope of Works

- 3 pcs MV Transformers, Switchgear and ABB Central Inverters
- Solar Panels
- Electrical Design Electrification works for MV and LV utilities
- Cabling Works Cable Tray and Conduit Installation
- RTU Panels IEC104 with Main Control Center Communication

Projects