Seferihisar Wind Power Plant Substation Automation

Turkey

4 MW

Scope of Works

- RTU and Communication Panels,LV Distribution Panels
- All Control and Automation Panels E-plan Design
- ABB RTU560 IEC101 with TEİAS National Control Center Communication
- ABB Integrated HMI IEC 61850 Communication
- Primer and Seconder Equipment Test, Commissioning and Trainings
- Electrical Design Electrification works for LV Distribution Panels
- Wind Monitoring and Forecasting System