Seymen Landfill Gas Power Plant Substation

Turkey

154 kV Substation

Scope of Works

- Primary & Secondary Design & Technical Consultantancy
- Supply of all Electrical Equipment (HV Transformer, HV Switching - Devices, HV Voltage-Current Transformers MV Switchgears and all necessary equipments, Protection and Control Panels, MDB & Mashalling Panels,)
- Installation of all Electrical Equipment and Cabling
- Energy SCADA System ABB MicroSCADA 9.4
- Software and Hardware Engineering
- All approvals of Project Documents at TEİAŞ
- Test and Commissioning
- Training