Scope of Works


• 8x1,5 MW generator synchronization, operation has been successfully on island mode. Power plant operated in isolation from the national or local electricity distribution network. Generators connected to the electricity grid in parallel mode, which can generate independently in the event of a grid power supply failure.

- ABB 1600kVA 0.4/6.3KV step-up transformers (8 pieces)
- ABB Metal-Clad Medium Voltage Switchgears
- ABB AC500 Control System (PLC)
- ABB Digivis SCADA
- Woodward Generator Controller (8 pieces)
- Totally 512 Input / Output