HISTORY

2023

2023

We started to work on a project for a 44 MW Wind Power Plant to be built in Macedonia.

Project design and development works started on green hydrogen production, transmission, utilization, and storage by YEO Hydrogen.

We started Solar Power Plant Projects with a total power of 160 MW.
2022

2022

R&D works on artificial intelligence-supported battery materials were accelerated with Ni-Cat.
2021

2021

YEO expanded its partnerships in the field of renewable energy with its partnerships with MARINERGY, DEFIC Globe, and MİKROHES.

We signed a contract for all electrification and automation works within the scope of the Advanced Water Treatment Plant Project with 90,000 m³/day capacity to be built in Ulaan Baatar, Mongolia.
2020

2020

With the biogas, biomass, geothermal and solar power plants completed in 11 different provinces in Türkiye, 5,890,706 tons/year of avoided carbon emissions were achieved with a total installed capacity of 71 MW.

11 MWp and 16 MWp Solar Power Plant Projects were successfully completed in Ukraine.
2019

2019

We started to work on a project called “National Load Dispatch Center Project” (Power Grid Monitoring and Control System for 21 Power Plants & 72 Substations & 249 Distribution Centers), which will ensure Azerbaijan’s energy security.

We started to work on “Nizami 220 kV GIS Substation” and the project called “the first gas-insulated substation” in Azerbaijan.
2018

2018

We started to work on a project ordered by the Istanbul Metropolitan Municipality, “Seymen Landfill Gas Power Generation Plant”, which will be the largest in the world when it operates at full capacity.
2017

2017

We started the turnkey construction of the electrical automation works within the scope of the Wadi Arab Water Supply System Phase-II Project in Jordan.

YEO Solar brand was registered.
2016

2016

Our activities started for the electrical automation works of the pump stations within the scope of the Wolkayit Irrigation Project in Ethiopia.
2013

2013

Business development activities started in Azerbaijan, where we would serve many large institutions and organizations such as SOCAR, AzerEnerji, Azerışık in the future.
2009

2009

A partnership agreement was signed with Switzerland-based ABB, one of the world’s largest electricity companies.
2004

2004

YEO Teknoloji Enerji ve Endüstri Anonim Şirketi was established.